Project Details
Completed: 2012
Awards: LEED Silver for New Construction
Project Description
Krempp Construction acted as the general contractor and designer in this $13 million dollar project. The high security, anti-terrorism standard project consisted of a permanent addition to the existing building. The addition is a two-story structure with includes engineering labs, analysis labs, test and evaluation labs, engineering and logistics support, shipping/receiving, conference rooms, lunch/break rooms, restrooms, and mechanical rooms. The main entry includes a 45′ tall disabled missile.