• Skip to main content
  • Skip to footer

Krempp Construction, Inc.

Over 100 Years of Quality & Integrity

  • Home
  • History
  • Our Company
    • Leadership
    • Financial Strength & Capabilities
    • Services
    • Awards & Recommendations
    • Sustainability
    • Safety & Quality Control
  • Featured Projects
  • Contact Us

Electrochemistry Engineering Facility

Project Details

Location: Crane Naval Surface Warfare Center
Owner: US Navy, Crane NSWC
Completed: 2005
Awards: 2006 DBIA Ohio Valley Chapter Design-Build Awards

  • Electrochemistry Engineering Facility

Project Description

The project scope consisted of the design and construction of a new 67,000 SF addition. The high tech state-of-the-art facility consisted of a 2-story structural steel frame with precast exterior. The facility contained clean rooms, waste treatment plant, 4 electroplating lines, dry room, cold room, several labs, centrifuge rooms and vibrator, an elevator, and an open office. Krempp Construction acted as the Design/Build Contractor while self-performing substructure and superstructure activities.

Footer

Contact Krempp Construction

215 Main Street
Jasper, IN 47546
Get Directions
812-482-6838

Copyright © 2025 Krempp Construction, Inc. All Rights Reserved.

Designed by: IdeaFusion Media